Indira Sagar Project / Borar River Aqueduct System
We have undertaken this one-of-its-kind irrigation project Narmada Valley Development Authority, Bhopal (M.P). It involves construction of Irrigation Canal passing through highly undulated terrain and in the process negotiates hills and valleys. To achieve this alignment of the main canal comprises of many Aqueducts & CM & CD works. One major Aqueduct, i.e. Borar Aqueduct is spanning for a length of 650 meters over 27 no. of piers of a maximum height of 46 meters long pier. The diameter of the piers is ranging from 3.6 to 2.7 meters. The discharge of water through this aqueduct is 48.654 Cumecs. The top slab of the trough has been designed for IRC class ‘A’ loading to facilitate movement of heavy vehicles over this Aqueduct. At the downstream of this Aqueduct the canal alignment enters into the Tunnel of 6.0m dia.
Sripada Sagar
Built on the Godavari River, this challenging project involves setting up of a six stage pumping system of 505 metre head, laying of pipelines stretching over a length of more than 118 kms and construction of a 185 km canal distribution network.
The irrigation scheme irrigates 2 lakh acres of ayacut in the upland area of Karimnagar district in Andhra Pradesh. Main works included supply, installation and commissioning of pumping machinery, transformers, sub-stations, pressure mains including construction of pump house all civil structures to supply 12 TMC of water to the Karimnagar district.
HNSS Lift Irrigation Project
As a testimony to our exemplary expertise and reputation in the field, the Government of Andhra Pradesh awarded it this prestigious lift irrigation project in Asian continent.
This dream project of Royalaseema envisages providing irrigation to the extent of 6 Lakhs Acres as well as drinking water for 33 lakhs people in the drought prone areas in four districts ( Kurnoor, Ananthpur, Chittor & Kadapa) of Andhra Pradesh, by lifting 114.20 Cumecs of water.
This project is divided into 2 stages, namely Stage-I & Stage-II
1. Stage-I comprises of 53 cumulative no’s of pumps at 11 pumping stations with total head of 348 meters and total discharge of 38 Cumecs of water in 11 stages with cumulative discharge of 356.44 Cumecs.
2. Stage-II comprises of 64 cumulative no’s of pumps at 8 pumping stations with total head of 272 meters and total discharge of 76.2 Cumecs of water in 8 stages with cumulative discharge of 609.6 Cumecs.
Varangaon : Talwel Gat Parisar Sinchan Yojana
We undertook this turnkey project for Tapi Irrigation Development Corporation (TIDC) to irrigate 30000 hectares of land. The works included construction of Rising Main of 12 km. length (1840-mm dia. M.S. pipe), Pumps totaling 18250 HP, Intake Structure, Delivery Chamber, 31.5 m x 16 m size pump house for Stage 1, 42 m x 17.5 m size pump house for Stage 2, 10 km of 33 KV Transmission Line, and two 33/11 KVA / 6.6 KVA substations (10 MVA and 6 MVA).
It was executed for Tapi Irrigation Development Corporation (TIDC).
Puranadar Lift Irrigation Scheme
(Under Narmada Valley Development Authority in Madhya Pradesh)
This project, on the Narmada river, envisages delivery of critical water for irrigation to over 35,000 hectares. The project comprises 3 pumping stations and 600 kms of MS, GRP & HDPE pipelines.
The Punasa Lift Irrigation Scheme is located near village Punasa in Khandwa District. This project, on the Narmada river, comprises of the 3 stage lifting and storage of water in 3 balancing reservoirs having aggregate storage capacity of more than 14 MCM. Apart from providing the drinking water facilities to the 119 villages, this project envisages to provide irrigation facilities to an extent of 36500 hectares by pipeline network in the distributor system. Total length of the different pipeline (MS, GRP & HDPE) network under the distribution system is about 475 kms. IVRCL was awarded an incentive of Rs. 11.68 Crores for the early completion of the milestone programme up to the period of February 2010.
Dehani Scheme, Maharashtra
To bring about a qualitative difference in the lives of farmers of Yavatmal District of Maharashtra, IVRCL took up this project to cater to the irrigation needs of 17 villages.
The project includes two pump houses with 57 zonal sumps. Irrigation, will be provided for 4,121.41 hectares in Stage - I followed by 2,846.77 hectares in Stage I providing end-to-end Drip Irrigation solution.
Water Users’ Societies have been formed to train farmers to use this system optimally.
The project is technologically sophisticated to irrigate Vidarbha, a large semi-arid region. The project envisages irrigation of 6,968 ha in Dehani, Babhulgaon and Yavatnal districts.
First of its kind in India, the project envisions drip irrigation of a large area while making use of the latest communication technology.
The Supervisory Control and Data Acquisition System (SCADA) interconnects all components of the system via satellite uplink, making it possible for the control command centre of the irrigation scheme to control all the components remotely.
Lower Goi Irrigation Project
The Lower Goi Project is located in the tribal areas of District Barwani of Madhya Pradesh State. The project scope includes construction of a gravity dam with earthen bunds on both side and concrete NOF & OF sections, having maximum height of 42 m in the gorge portion and spanning to a total length of 2,260 m. The central portion will be sufficient to allow a smooth discharge of 12026 cusecs of flood water. This dam is designed with 9 noses of hydraulically operated gates of 12 m x 12 m. The project also envisages the development of irrigation potential of 32,767 acres of ayacut through its right canal.
Puranadar Lift Irrigation Scheme
Purandar Lift Irrigation Project is a turnkey project for Designing, Planning, Constructing pump houses at 6 stages. A total EPC Project with survey and mapping of 50200 ha., total of 20 pumps and 36700 HP capacity; M.S. rising main 2200 mm, irrigation network of 198 kms., construction of 132/33KV substation, 35000 KVA and 10000 KVA transformers; 33 KV transmission lines for 13.5 kms., SCADA and a Railway crossing by Pushing and Jacking technology with 2800 mm dia. x 20mm thick M.S. casing pipe; total length of the crossing -32m.
This is the largest size of pipe which has been pushed under rail tracks in India so far.
Muktainagar Lift Irrigation Scheme
Supply, Erection, Testing & Commissioning of 8500 Cum/Hr Vertical Turbine Pumps, Rising mains of 1100 mm dia., 3.6 kms. distribution system, 33 KV electrical substation, delivery chamber of 1.5 million litres for irrigating 3360 ha., executed within 110 days.
Major Lift Irrigation Schemes in the State of Andhra Pradesh
Lift Irrigation schemes involving detailed Investigation, Soil exploration, Design, Supply, Testing and Commissioning of pumping machineries, transformers, substations, Rising main including construction of pump house all civil & structural works, CM & CD works, channels, delivery system, Excavation, Embankment, with and without lining etc. under Government of Andhra Pradesh - I & CAD Department in various districts of Andhra Pradesh State on turnkey basis.
Koilsagar Lift Irrigation Scheme Stage I & II
In Koilsagar Irrigation Project constructed to irrigate an ayacut of 12000Acres, in Mahaboobnagar district, ayacut has not fully developed. It is now proposed to lift water from fore shore of Jurala Project in two stages to a total lift of 120m with 4 Nos. of Pumps of 10,000 HPreach and to fill up the Koilsagar Project to stabilize the ayacut of 12000 Acres including a gap ayacut of 7500 Acres and to irrigate an additional 38250 Acres bringing the total to 50,250 Acres under the project at a quoted value of Rs.360.20 Crores.
In the process operation such as detailed investigation two tunnels of total length of 10.16 KMs, two Pump houses, two surge pools, excavation of approach and gravity canals , CM & CD works, fixing of pressure mains and excavation of net work of distributory system is required to be done under the contracts.
Lift Irrigation Scheme to lift water from Fore Shore of Gandikota reservoir near Thimmapuram (v) and then from Thimmapuram (v) to storage Reservoir near Yellanur (v) – (Package L1 -01/2006&. Package L1 -02 /2006).
The scheme consists of (i) Lifting 8.31 TMC of water from foreshore of Gandikota reservoir near Thimmapuram from EL204.00m to EL221.00m in the 1st stage to irrigate 5000 Acres and (ii) to lift 8.10TMC of water in 2nd stage from Thimmapuram reservoir from EL 219.00m to El 236.00m to irrigate 3500 Acres.
In the process the operations such as detailed investigation, formation of reservoir at Thimmapuram, and Yellanur, fabrication and laying of Pressure mains, locating pump houses, designing distributory system to irrigate 5000 Acres in stage-I and 3500 Acres in StageII including construction of approach channels are required to be done at a total cost of Rs.551 Crores.
HNSS Phase –I and HNSS Stage -II –Phase –I
HNSS Phase-I comprises detailed investigation, design and construction of 8 Nos. pump houses on HNSS main canal and 3 No. on Perur Branch canal including all civil works such as sump and pumping mains required for the system and commissioning of project to lift 109.02 Cumecs of water from foreshore of NSR project at Malyala (v) in Kurnool District to irrigate 6.025 lakh Acres in drought prone area of Rayalaseema, besides supplying drinking water to 33 lakh people enroute
HNSS Phase –I Stage-II comprises investigation manufacture supplying and erection of pumps, Pressure mains, (Hydro- Mechanical and Electro Mechanical equipment complete) and commissioning at 8 pumping stations at a total cost of Rs.1319 Crores.
Telugu Ganga Project (TGP) Package-III
Telugu Ganga Project – Package-III comprise investigation and construction of SPVBR left canal beyond Porumamilla tank and SPVBR Right canal and distributaries in block Nos.10 to 23 of left canal and 1 to 10 of right canal including subsoil exploration, preparation of hydraulic particulars, design of CM & CD works, detailed estimates and lining of distributory system to irrigate an ayacut of 96,300 Acres at a cost of Rs.222.30 Crores.
Indirasagar Lift Irrigation (Polavaram) Package – 31/2006
Indirasagar Lift Irrigation Project (Polvaram) Package-31 is envisaged to lift 51.5 Cumecs of Godavari water in stages from Rudramakota village in Khammam district to Elevation +273m to Irrigate 2.00 Lakh Acres.
The Package comprises detailed investigation and construction of approach channel of 7KMs. Length, construction of three pump houses 1st at Koyamadaram village, 2nd at Peddavagu project foreshore and 3rd at Bondarugudem tank to the cistern at Arlapenta, and laying 3 rows of pressure mains totally of 31KMs connecting the pump houses to lift Godavari water from EL-40.00 to EL.273.00 including construction of required CM, CD works enroute at a cost of Rs.156.20 Crores.
Flood Flow Canal Project from SRSP from KM.57.00 to 70.00.
The Flood Flow canal package from KM.57.00 to KM 70.00 of SRSP main canal comprises detailed investigation, design and construction from Kathlapur Village in Karimnagar to carry a discharge of 623 Cumecs of water to irrigate an ayacut of 2, 20,000 Acres in karimnagar, Warangal and Nalgonda districts in two stages and supplying drinking water to the enroute villages including construction of structures on the canal reach at the cost of Rs. 195.00 Crores.