IRRIGATION PROJECTS
Puranadar Lift Irrigation Scheme
Purandar Lift Irrigation Project is a turnkey project for Designing, Planning, Constructing pump houses at 6 stages. A total EPC Project with survey and mapping of 50200 ha., total of 20 pumps and 36700 HP capacity; M.S. rising main 2200 mm, irrigation network of 198 kms., construction of 132/33KV substation, 35000 KVA and 10000 KVA transformers; 33 KV transmission lines for 13.5 kms., SCADA and a Railway crossing by Pushing and Jacking technology with 2800 mm dia. x 20mm thick M.S. casing pipe; total length of the crossing -32m.
This is the largest size of pipe which has been pushed under rail tracks in India so far.
Muktainagar Lift Irrigation Scheme
Supply, Erection, Testing & Commissioning of 8500 Cum/Hr Vertical Turbine Pumps, Rising mains of 1100 mm dia., 3.6 kms. distribution system, 33 KV electrical substation, delivery chamber of 1.5 million litres for irrigating 3360 ha., executed within 110 days.
Major Lift Irrigation Schemes in the State of Andhra Pradesh
Lift Irrigation schemes involving detailed Investigation, Soil exploration, Design, Supply, Testing and Commissioning of pumping machineries, transformers, substations, Rising main including construction of pump house all civil & structural works, CM & CD works, channels, delivery system, Excavation, Embankment, with and without lining etc. under Government of Andhra Pradesh - I & CAD Department in various districts of Andhra Pradesh State on turnkey basis.
Koilsagar Lift Irrigation Scheme Stage I & II
In Koilsagar Irrigation Project constructed to irrigate an ayacut of 12000Acres, in Mahaboobnagar district, ayacut has not fully developed. It is now proposed to lift water from fore shore of Jurala Project in two stages to a total lift of 120m with 4 Nos. of Pumps of 10,000 HPreach and to fill up the Koilsagar Project to stabilize the ayacut of 12000 Acres including a gap ayacut of 7500 Acres and to irrigate an additional 38250 Acres bringing the total to 50,250 Acres under the project at a quoted value of Rs.360.20 Crores.
In the process operation such as detailed investigation two tunnels of total length of 10.16 KMs, two Pump houses, two surge pools, excavation of approach and gravity canals , CM & CD works, fixing of pressure mains and excavation of net work of distributory system is required to be done under the contracts.
Lift Irrigation Scheme to lift water from Fore Shore of Gandikota reservoir near Thimmapuram (v) and then from Thimmapuram (v) to storage Reservoir near Yellanur (v) – (Package L1 -01/2006&. Package L1 -02 /2006).
The scheme consists of (i) Lifting 8.31 TMC of water from foreshore of Gandikota reservoir near Thimmapuram from EL204.00m to EL221.00m in the 1st stage to irrigate 5000 Acres and (ii) to lift 8.10TMC of water in 2nd stage from Thimmapuram reservoir from EL 219.00m to El 236.00m to irrigate 3500 Acres.
In the process the operations such as detailed investigation, formation of reservoir at Thimmapuram, and Yellanur, fabrication and laying of Pressure mains, locating pump houses, designing distributory system to irrigate 5000 Acres in stage-I and 3500 Acres in StageII including construction of approach channels are required to be done at a total cost of Rs.551 Crores.
HNSS Phase –I and HNSS Stage -II –Phase –I
HNSS Phase-I comprises detailed investigation, design and construction of 8 Nos. pump houses on HNSS main canal and 3 No. on Perur Branch canal including all civil works such as sump and pumping mains required for the system and commissioning of project to lift 109.02 Cumecs of water from foreshore of NSR project at Malyala (v) in Kurnool District to irrigate 6.025 lakh Acres in drought prone area of Rayalaseema, besides supplying drinking water to 33 lakh people enroute
HNSS Phase –I Stage-II comprises investigation manufacture supplying and erection of pumps, Pressure mains, (Hydro- Mechanical and Electro Mechanical equipment complete) and commissioning at 8 pumping stations at a total cost of Rs.1319 Crores.
Telugu Ganga Project (TGP) Package-III
Telugu Ganga Project – Package-III comprise investigation and construction of SPVBR left canal beyond Porumamilla tank and SPVBR Right canal and distributaries in block Nos.10 to 23 of left canal and 1 to 10 of right canal including subsoil exploration, preparation of hydraulic particulars, design of CM & CD works, detailed estimates and lining of distributory system to irrigate an ayacut of 96,300 Acres at a cost of Rs.222.30 Crores.
Indirasagar Lift Irrigation (Polavaram) Package – 31/2006
Indirasagar Lift Irrigation Project (Polvaram) Package-31 is envisaged to lift 51.5 Cumecs of Godavari water in stages from Rudramakota village in Khammam district to Elevation +273m to Irrigate 2.00 Lakh Acres.
The Package comprises detailed investigation and construction of approach channel of 7KMs. Length, construction of three pump houses 1st at Koyamadaram village, 2nd at Peddavagu project foreshore and 3rd at Bondarugudem tank to the cistern at Arlapenta, and laying 3 rows of pressure mains totally of 31KMs connecting the pump houses to lift Godavari water from EL-40.00 to EL.273.00 including construction of required CM, CD works enroute at a cost of Rs.156.20 Crores.
Flood Flow Canal Project from SRSP from KM.57.00 to 70.00.
The Flood Flow canal package from KM.57.00 to KM 70.00 of SRSP main canal comprises detailed investigation, design and construction from Kathlapur Village in Karimnagar to carry a discharge of 623 Cumecs of water to irrigate an ayacut of 2, 20,000 Acres in karimnagar, Warangal and Nalgonda districts in two stages and supplying drinking water to the enroute villages including construction of structures on the canal reach at the cost of Rs. 195.00 Crores.