| Transportation... |
IVRCL has been on the fast track in the Indian transportastion sector, by adopting environment-friendly procedures and technologies to modernize and maintain India’s most motorable roads. |
|
| |
 |
NATIONAL HIGHWAYS |
 |
|
Project: Srikakulam - Palasa, National Highway Project |
| Client: National Highways Authority of India |
Widening to 4/6 lanes and upgrading of existing 2 lane road including minor bridges, service roads and auxiliary works in the State of Andhra Pradesh for 74 kms. |
|
|
Project: Rajahmundry - Dharmavaram, National Highway Project |
| Client: National Highways Authority of India |
4 laning and strengthening of Rajahmundry-Dharmavaram Section of NH-5 in Andhra Pradesh for a length of 53 kms.
|
|
|
 |
NATIONAL HIGHWAYS-BOT PROJECTS |
 |
|
Project: National Highway Projects (BOT) |
| Client: National Highways Authority of India |
Improvement, Operation and Maintenance including Strengthening and Widening of existing 2-lane road for 4-lane dual carriage way on Build, Operate & Transfer (BOT) basis. |
| |
 |
Salem to Kumarpalyam on NH-47 in the State of Tamilnadu for 53 kms. |
| |
 |
Kumarpalyam to Chengapalli on NH-47 in the State of Tamilnadu for 47 kms. |
| |
 |
Jalandhar - Amritsar section on NH-1 in the State of Punjab for 49 kms. |
| |
 |
Guna - Bypass section NH-3 in the State of Madhya Pradesh for 13 kms. |
|
|
|
 |
STATE HIGHWAYS |
 |
|
Project: Nandyal to Giddalur, State Highway |
| Client: R & B Department, Government of Andhra Pradesh |
Andhra Pradesh State Highway Project, Phase-III, Package 11, Widening and Strengthening of Section-III of road including RUBs, ROBs, Ghat Section etc. for a length of 48 kms. |
|
|
Project: Indore – Sanawad – Burhanpur – Icchapur – Edalabad State Highway Project |
| Client: Madhya Pradesh Rajya Setu Nirman Nigam Limited |
Survey, Investigation, Design, Financing, Procurement, Planning, Monitoring, Construction, Operation, Maintenance, Strengthening & Widening of existing 2 lane State Highways: SH - 27 (including all types of bridges) connecting towns of Indore – Sanawad – Khandwa – Burhanpur – Edalabad in the State of Madhya Pradesh. Total Length of the Road - 200 kms. |
|
|
 |
RAILWAYS |
 |
|
| Project: Solapur - Mohol B.G. Railway Line |
| Client: Rail Vikas Nigam Limited |
Doubling of existing B.G. Railway Line between Solapur and Mohol on Pune-Wadi section of Central Railways on Mumbai-Chennai trunk route as part of the Golden Quadrilateral of Indian Railways, on turnkey basis, for a total length of 36 kms., including signalling, telecom and other amenities. |
|
|
Project: Sky Bus Metro, Goa
|
| Client : Konkan Railway Corporation Limited |
The first test track for testing and certifying various subsystems of Sky Bus. |
|
|
 |
TUNNELS |
 |
|
| Project: Udhampur – Srinagar – Baramulla Rail Link Project in Jammu & Kashmir |
| Client: Konkan Railway Corporation Limited |
Construction of B.G. Single Line Tunnels on the Katra-Laole section of the Udhampur-Srinagar-Baramulla Rail Link Project., for a length of nearly 7 kms. including approach roads of 42 kms. |
|
|
| Project: Amby Valley – Sahara Lake City – Internal Road Project |
| Client: Sahara India Pariwar |
Construction of internal roads and spine roads of 26 kms., varying from single lane to four-lane way including service corridors, services like electrical, communication, water supply, sewage services, landscaping, culverts, crossings etc. |
|
|
 |
BRIDGES |
 |
|
| Project: Construction of 12 Bridges in Tamilnadu |
| Client: Highways & Rural Works Dept., Madurai |
Design & construction of bridges on turnkey basis. |
|
|
| Project: Earthwork - Excavation |
| Client: Singareni Collieries Company Limited |
Earthwork, Excavation of various rocks/earth, Cutting, Blasting, Loading, Transportation, Dumping and Dozing of 5.5 million cum. by using heavy machines at
Koyagudem Open Cast Miing Project.
|
|