Power is the key driver of infrastructure development and IVRCL has chalked out a clear itinerary to capture a major chunk of this sector, with: |
|
| |
 |
TRANSMISSION LINES |
 |
|
Project: Transmission Line Project from Visakhapatnam to Kathipudi |
| Client: A P TRANSCO |
400 KV Double Circuit Transmission line of 100 kms. on Design, Supply and Erection including civil works on turnkey basis including tower fabrication, erection & stringing of moose conductor. |
|
|
| Project: Transmission Line Project from Palandur to Chandrapur |
| Client: Power Grid Corporation of India Limited |
400 KV Double Circuit Transmission line of 80 kms.
|
|
|
| Project: Transmission Line Project from Vishnuprayag to Muzaffarnagar |
| Client: Power Grid Corporation of India Limited |
400 KV Double Circuit Transmission line from Vishnuprayag to Muzaffarnagar of 80 kms.
|
|
|
 |
SUBSTATIONS |
 |
|
| Project: 220 KV & 132 KV Substations |
| Client: UB Engineering Limited / Haryana Vidyut Prasaran Nigam Limited (HVPNL) |
220/132KV EHV Substation at Jind with 18 bays and 132/11 KV Substation at Uchana with 6 bays and 132/33 KV Substation at Julana with 3 bays including Supply, Erection, Testing and Commissioning of 100 MVA, Transformers with civil works etc., on turnkey basis. |
|
|
| Project: Construction of 33/11 KV Substation at Ruse - Raipur |
| Client: M/s Chattisgarh State Electricity Board |
Supply, erection, testing & commissioning of 33/11 KV Substation with 5 bays including civil works. |
|
|
| Project: High Voltage Distribution System |
| Client: ALSTOM Transmission & Distribution Systems |
765 KV Substation project at Sipat. |
|
|
| Project: 132 KV Substation |
| Client: Maharashtra Krishna Valley Development Corporation (MKVDC) |
132/33 KV EHV Substation at Purandar with 17 bays including Supply, Erection, Testing and Commissioning of 31.5 MVA Transformer with civil works etc., on turnkey basis.
|
|
|
| Project: Civil & Structural Works for Power Projects at Bhadrawati, Maharashtra and Vizag, A.P. |
| Client: Alstom India Limited |
Constructed GEC Alstom's 2 x 500 MW High Voltage Direct Current (HVDC) Converter Station at Bhadrawati (Maharashtra) and 1 x 500 MW HVDC at Vizag (A.P.) |
|
|
|
 |
DISTRIBUTION SYSTEMS |
 |
|
| Project: 400 KV Switchyard and Civil Works at Gajuwaka |
| Client: Bharat Heavy Electricals Limited |
Foundations for Gantry Towers, equipment support structures, shunt reactors, auxiliary transformers, substation electrical works, trenches etc., at 400 KV AC Switchyard.
|
|
|
 |
APDRP WORKS |
 |
|
Project: Refurbishment of 33 KV, 11 KV and LT lines including reconductoring works under APDRP scheme |
| Client: Eastern Power Distribution Company of Andhra Pradesh Limited (APEPDCL), Nidadavolu, Visakhapatnam, Andhra Pradesh |
|
|
| Project: Conversion of existing LV Network into HVDS project under APDRP scheme |
| Client: Eastern Power Distribution Company of Andhra Pradesh Limited (APEPDCL), Nidadavolu, Visakhapatnam, Andhra Pradesh |
| |
| Erection, testing and commissioning of 65 nos. of 15 KVA; 78 nos. of 25 KVA; 312 nos. of 40 KVA three phase DTRs and 137 kms. of 34 sq.mm., AAA conductor. |
|
|
Project: Providing 24 hours power supply to rural areas in Narasaraopet division in Guntur district, A. P. |
| Client: Southern Power Distribution Company of Andhra Pradesh (APSPDCL), Tirupathi, Andhra Pradesh |
| Erection, testing and commissioning 648 nos. of 15 KVA single phase Distribution Transformers. |
|
|
| Railway Traction - OHE works |
Project: 25KV AC Traction Overhead Equipment (OHE) in section of Walajah to Thalangai
of Southern Railway |
| Client: Southern Railways, Chennai |
| OHE works on turnkey basis including Design, Supply, Erection and Commissioning of 25 KV AC traction. |
|
 |
RURAL ELECTRIFICATION WORKS |
 |
|
| Clients: |
Madhyanchal Vidyut Vitaran Nigam Ltd.,
Dakshinanchal Vidyut Vitaran Nigam Ltd.,
Paschimanchal Vidyut Vitaran Nigam Ltd.,
National Hydro Power Corporation Ltd.,
UP Power Corporation Ltd.,
Power Grid Corporation of India Ltd. etc. |
|